Integration

ERP Dispatch Data into a Logistics Control Tower.

The ERP already knows what was invoiced and dispatched. A control tower should start from that sheet, not ask the plant to type trips again.

What this source gives the control tower

How SCM for Manufacturers reads it

The daily ERP dispatch sheet seeds every trip, promise date and route distance. It is parsed and validated before anything is written, so a bad file never goes live unreviewed; the decision on each conflict is remembered on the next upload.

Checks before anything goes live

All six sources land on one record per trip in SCM for Manufacturers: the ERP dispatch sheet, carrier MIS files, FASTag and SIM, GPS and carrier APIs, the gate handheld, and POD with reconciliation. Every conflict with what is already recorded waits for a person. See the control tower guide.

Questions

Does the control tower replace the ERP?

No. It reads the ERP’s dispatch data and adds what happens after dispatch: placement, gate, transit, delivery, claims and carrier scores.

What if the ERP export changes format?

The file is staged and validated first; changes are caught before anything is written.

See it on your own data. SCM for Manufacturers puts the plant gate, carriers, RDC stock, cold chain and OTIF on one control tower. Book a 30-minute working session with an engineer.

General guidance, current as of the date above. Figures and examples are illustrative unless a source is linked.