Freight cost per ton, per tonne-km and per case: how to calculate it.

Freight rate per truck tells you what you paid. Cost per ton, per tonne-km and per case tells you whether you paid well, and which lanes and plants to fix.

The formulas

MeasureFormulaUse it for
Cost per tripTruck freight + loading/unloading + detention + other chargesThe real cost of one movement
Cost per tonTotal freight cost ÷ tonnes deliveredComparing plants, RDCs and products
Cost per tonne-kmTotal freight cost ÷ (tonnes × km)Comparing lanes of different lengths and carriers
Cost per caseTotal freight cost ÷ cases deliveredProduct and customer profitability
Freight as % of salesTotal freight cost ÷ sales value × 100Management view over time

Worked example (illustrative)

A 20-tonne truck carries 18 tonnes over 600 km for ₹45,000, with ₹2,000 of detention.

Costs people forget

How manufacturers bring it down

  1. Fill trucks better with load planning and part-load consolidation.
  2. Cut plant turnaround time to reduce detention.
  3. Hold carriers to placement so fewer trucks are expedited.
  4. Allocate business to carriers by a fair scorecard, not only the lowest rate.

How SCM for Manufacturers tracks it

SCM for Manufacturers seeds every trip from the ERP dispatch sheet with promise date and route distance, adds gate dwell, detention and delay ownership, and reports freight by plant, lane and carrier, along with freight CO₂e per leg on the same tonne-km basis.

Questions

How is freight cost per ton calculated?

Divide the total freight cost of the movement, including detention and other charges, by the tonnes delivered.

What is cost per tonne-km?

Total freight cost divided by tonnes multiplied by kilometres. It lets you compare lanes of different distances.

Why is cost per ton better than freight per truck?

Because it shows how well each truck was used. A cheap truck sent half empty can cost more per ton than an expensive full one.

See it on your own data. SCM for Manufacturers puts the plant gate, carriers, RDC stock, cold chain and OTIF on one control tower. Book a 30-minute working session with an engineer.

General guidance, current as of the date above. Figures and examples are illustrative unless a source is linked.