
Calculator
Plant Truck Turnaround Time Calculator.
Enter minutes spent in each stage to see total turnaround and where the time goes.

Enter minutes spent in each stage to see total turnaround and where the time goes.
Total turnaround is the sum of the stages; loading is often a small share. The biggest stage is where to act first. The 2 h 30 m benchmark is the gate TAT target in the KPI dictionary. Read plant gate turnaround time.
It depends on product and process; 2 h 30 m gate-in to gate-out is the target used in the SCM for Manufacturers KPI dictionary.
Because the total hides where trucks wait. Stage dwell shows whether to fix scheduling, the yard, loading or paperwork.
See it on your own data. SCM for Manufacturers puts the plant gate, carriers, RDC stock, cold chain and OTIF on one control tower. Book a 30-minute working session with an engineer.