Guide · KPIs

OTIF vs fill rate vs DIFOT: the formulas, and why your numbers disagree.

OTIF counts orders that arrive both on time and complete; fill rate counts how much of what was ordered was shipped, by line or by case, and ignores time. DIFOT is the same measure as OTIF under another name. That is why one week can read 98% case fill rate and only 70% OTIF. Fix the definition before you fix the number.

A supply chain control tower computes OTIF from one written definition, the same way for the company, the 3PL and the carrier, so the formulas below give one number instead of three.

What is the difference between OTIF, DIFOT and fill rate?

MetricFormulaCounts as success when
OTIF (on time, in full)Orders delivered on time and in full ÷ total orders × 100The whole order arrives in the agreed window and complete
DIFOT (delivered in full, on time)Same as OTIF; the name used in Australia and parts of EuropeSame as OTIF
Line fill rateOrder lines shipped complete ÷ order lines ordered × 100Each line is full, regardless of time
Case fill rateCases shipped ÷ cases ordered × 100Measures volume, so one big short line barely moves it
On-time deliveryOrders delivered in the window ÷ total orders × 100Time only, quantity ignored

Fill rate vs OTIF: which one should you track?

Track both, because they answer different questions. Fill rate tells you whether stock was there to ship: it measures quantity only. OTIF tells you whether the customer got the whole order inside the promised window: it adds time and judges each order as pass or fail. A high fill rate with a low OTIF points to dispatch or transport, not stock.

What you seeWhere to look first
Fill rate falls, OTIF falls with itStock: forecast, production plan or replenishment to the RDC
Fill rate steady, OTIF fallsTime: late dispatch, truck placement, transit delays or the customer’s dock
Case fill rate high, line fill rate lowMany small lines short, often slow-moving SKUs that a case count hides
OTIF high, fill rate lowThe OTIF rule may count partial orders as “in full”; check the written definition

How do you calculate OTIF and fill rate? A worked example

An RDC places 10 orders in a week, 1,000 cases in total. Eight arrive on time; one of those eight is short by 20 cases; the other two arrive a day late but complete.

The same week reads 98%, 80% or 70% depending on who reports it. This is why transport, sales and the customer argue: they are all correct about different metrics.

Why do OTIF numbers disagree inside one company?

How to make one OTIF everyone accepts

  1. Write the rule down: promise date, window, point of measurement, order or line.
  2. Calculate it in one system, from data each party can inspect.
  3. Attribute every miss to an owner, shipper, customer or carrier, with a reason.
  4. Report OTIF alongside fill rate, so volume and service are both visible.

Work out your own numbers with the OTIF calculator, read DIFOT meaning and formula, and see why sales and logistics argue about OTIF.

How SCM for Manufacturers keeps one definition

SCM for Manufacturers calculates TAT, ETA, ATA and on-time verdicts the same way for every trip, in calendar days, from data the customer can inspect: on time, delay (+1 day) or super delay (+2 days or more). Every delayed trip must be attributed to the shipper, customer or carrier with a reason, and those attributions feed the carrier scorecard. Ten KPIs carry one definition each.

Questions

What is the difference between OTIF and fill rate?

OTIF counts an order as a success only if it is both on time and complete. Fill rate measures how much of the ordered quantity was shipped, regardless of time.

Can fill rate be high while OTIF is low?

Yes. Fill rate ignores time, so complete orders that arrive late still count in full. In this guide’s example the case fill rate is 98% while OTIF is 70%, because two complete orders came a day late and one on-time order was short.

Is DIFOT the same as OTIF?

Yes. DIFOT (delivered in full, on time) and OTIF measure the same thing; the names differ by region and company.

What is a good OTIF score?

It depends on the industry, the window and how strictly in full is defined. Compare your OTIF with your own trend under one written definition before comparing with benchmarks.

See it on your own data. SCM for Manufacturers puts the plant gate, carriers, RDC stock, cold chain and OTIF on one control tower. Book a 30-minute working session with an engineer.

General guidance, current as of the date above. Figures and examples are illustrative unless a source is linked.