Playbook

RDC Arrival Intimation: No Surprise Trucks.

An RDC arrival intimation is a notice sent to the regional distribution centre (RDC) when a truck is dispatched: which SKUs and batches are coming, the ETA and the condition of the load, updated as the ETA changes. With it, the RDC plans docks and labour before the truck arrives, instead of after it starts waiting.

The problem

RDCs learn about loads when trucks appear at the gate. The truck waits for a dock, and detention starts.

The signal to watch

An arrival notice per truck: what is coming, when, and in which condition, before the truck is at the dock. A supply chain control tower for manufacturers sends it at dispatch and keeps the ETA current as the truck moves.

The playbook

  1. Send the RDC an intimation at dispatch with SKUs, batches and ETA.
  2. Update the ETA as pings arrive.
  3. Flag temperature or damage concerns before arrival.
  4. Let the RDC plan the dock and labour slot.
  5. Stamp arrival and unloading to measure the dwell.

How to measure it

Track RDC unloading dwell and detention by RDC, and the share of trucks with an intimation sent before arrival.

In SCM for Manufacturers this runs on the same record as every other step from indent to settlement. Related: ETA rules, detention charges calculator, OTIF vs fill rate.

Questions

What is an arrival intimation?

A notice to the receiving RDC with what is coming, when and in which condition, sent before the truck reaches the dock.

What is the full form of RDC in logistics?

RDC stands for regional distribution centre: a warehouse that receives stock from plants or suppliers and redistributes it to distributors, stores or customers in one region. Because many inbound trucks converge on it, an RDC needs to know what is arriving and when.

How can an RDC track inbound trucks?

Through an arrival intimation per truck that carries a live ETA from GPS pings, updated as the truck moves, plus gate and unloading stamps at the RDC. The ETA lets the RDC plan the dock slot; the stamps measure unloading dwell and detention by RDC.

Is it the same as an ASN?

It serves the same purpose as an advance shipping notice, extended with live ETA and condition.

What should an RDC arrival intimation contain?

The truck and LR number, the SKUs, batches and quantities on board, the dispatch time, a live ETA and any condition flags such as a temperature excursion or suspected damage. With these the RDC can book a dock slot and labour before the truck arrives, instead of after it starts waiting.

What does “arrived at RDC” mean in tracking?

It means the consignment has reached the regional distribution centre and is waiting to be checked in and unloaded. The time between this status and the unloading stamp is the RDC’s unloading dwell; a long gap usually means the truck arrived without a dock slot planned.

See it on your own data. SCM for Manufacturers puts the plant gate, carriers, RDC stock, cold chain and OTIF on one control tower. Book a 30-minute working session with an engineer.

General guidance, current as of the date above. Figures and examples are illustrative unless a source is linked.