Plant Truck Turnaround Time Calculator.
Enter minutes spent in each stage to see total turnaround and where the time goes.

Enter minutes spent in each stage to see total turnaround and where the time goes.
Truck turnaround time is the time from a truck joining the queue at the plant to its gate-out, so here it is the sum of queue, gate, yard, loading and paperwork minutes. Loading is often a small share, and the biggest stage is where to act first. An average can hide a few very slow trucks, so also watch the slowest ones. A plant logistics control tower stamps each gate stage per truck, so the split comes from recorded times instead of estimates. The 2 h 30 m benchmark is the gate TAT target in the KPI dictionary. Read plant gate turnaround time.
TAT stands for turnaround time: how long a truck takes from arriving at a plant or warehouse to leaving it, loaded or unloaded. At a plant it is usually measured gate-in to gate-out and split into queue, gate, yard, loading and paperwork, so you can see where trucks wait.
It depends on product and process; 2 h 30 m gate-in to gate-out is the target used in the SCM for Manufacturers KPI dictionary.
Because the total hides where trucks wait. Stage dwell shows whether to fix scheduling, the yard, loading or paperwork.