3D twinIntegrated cement plant

Cement plant digital twin from quarry to kiln to bag: every tonne on one live flow.

A live 3D model of your quarry, raw mill, preheater and kiln, cement mills, packers and truck gate, fed by the historian, QC lab, SAP and weighbridge data you already keep. It shows where heat, power, quality or dispatch is slipping, what it costs per day, and who should act.

  • 11 views quarry, pre-blending, raw mill, kiln, cooler, cement mill, dispatch, energy, trace
  • ₹ per day on every variance: kcal/kg over norm, kWh/t, giveaway, detention
  • WhatsApp alerts to the operator, chemist or dispatcher who can fix it

01Live 3D twin

The whole cement plant, in one live model.

Step through eleven views from the limestone benches to the truck gate, then trace one dealer order from booking to gate-out. Click any machine for its record.

Loading the 3D plant…
3D Plant digital twin
LIVE · — · Shift B Colour by

What you see
    What AutoWhat does
      Fictional layout · sample data
      AI insights0 in this view
      Click a card to fly to the machine. Each alert reaches its owner on WhatsApp and the 9 am brief.
      Drag to rotate · scroll to zoom · click a machine or an insight card

      Fictional 2.5 MTPA integrated cement plant with sample data — your twin is drawn from your own site and systems.

      02Definition

      What a cement plant digital twin is, section by section.

      Each section is drawn to scale and tied to the system that records it, so every number has a source and a time.

      A cement plant digital twin is a live 3D model of a cement plant that updates from the historian, QC lab, ERP and weighbridge as material moves from the quarry through the kiln to the packer and the gate. It shows heat, power, quality and dispatch against norm for each section, prices each variance in rupees per day, and sends it to the operator, chemist or dispatcher who can correct it during the shift.

      Limestone quarry and crusher

      Mine
      What you see
      Benches, shovels, dumpers and the crusher, with every dumper trip timed and tagged to the bench it came from.
      Data it reads
      Dumper dispatch or trip logs, blast-hole chemistry, crusher belt scale, diesel issue.
      What it flags
      Crusher idle while dumpers queue, low-grade benches fed alone, oversize after a blast.

      Pre-blending stockpiles

      Stacker and reclaimer
      What you see
      Each pile's tonnage, layer count, chemistry and days of cover, plus laterite, bauxite, gypsum and fuel stock.
      Data it reads
      Belt scales, stacker and reclaimer PLC, pile samples from the lab, goods receipts.
      What it flags
      High or low CaO layers being reclaimed, gaps between piles, additives running short.

      Raw mill and CF silo

      Raw meal
      What you see
      The raw mill with LSF, silica and alumina modulus, residue, vibration and kWh per tonne on each hour.
      Data it reads
      Historian tags, on-line analyser or hourly XRF, feeder set-points, silo level.
      What it flags
      LSF out of band, vibration near trip, grinding finer than the kiln needs.

      Preheater, calciner and kiln

      Pyro-processing
      What you see
      Kiln feed, O₂ and CO, cyclone temperatures, kiln torque, shell scanner and fuel split, with specific heat against norm.
      Data it reads
      Historian at one-minute resolution, shell scanner, fuel feeders, hourly free lime.
      What it flags
      False air, hot spots on the shell, free lime above limit, alternative fuel below what the calciner can take.

      Clinker cooler and silo

      Clinker
      What you see
      Cooler fans, clinker temperature and the silo by compartment, with free lime and tonnage for each hour of clinker.
      Data it reads
      Cooler PLC, pan conveyor scale, silo level, lab results.
      What it flags
      Hot clinker, fan faults, off-spec clinker mixed into good stock, stock against mill demand.

      Cement mills

      Grinding
      What you see
      Ball mills and VRMs with Blaine, residue, SO₃, clinker and fly ash share, output and kWh per tonne.
      Data it reads
      Mill historian tags, lab Blaine and residue, recipe from the quality plan, 28-day strength.
      What it flags
      Over-grinding, fly ash share below what strength allows, hot mills and false-set risk.

      Packing plant and loading

      Bags
      What you see
      Rotary packers, bags per hour, bag bursts, average bag weight and each truck bay with its truck and bag count.
      Data it reads
      Packer controllers, bag counters or cameras, check-weighers, truck loading records.
      What it flags
      Jammed spouts, giveaway above target, idle bays while trucks wait.

      Truck gate, rail and bulk

      Dispatch
      What you see
      Parking, gate, weighbridges, rake loading and bulk tankers, with turnaround time for every truck.
      Data it reads
      SAP orders and invoices, gate RFID or ANPR, weighbridge, rake placement and loading memos.
      What it flags
      TAT above target, rake free time running out, net weight outside tolerance.

      Power, WHRS and utilities

      Energy
      What you see
      Power by section per tonne, WHRS output, solar, grid import, maximum demand and compressed air.
      Data it reads
      Energy meters, substation SCADA, WHRS DCS, solar inverters, compressor controllers.
      What it flags
      Sections over norm, WHRS below design, demand close to the contract limit, air leaks.

      03Measures

      Cement plant measures, each with a written definition.

      The numbers the twin keeps for every shift, computed from records rather than typed in, so process, quality, energy and dispatch teams see the same figure.

      MeasureWhat it tells youWhere it comes from
      Clinker production (tpd)Clinker made in 24 hours, from the kiln feed rate and the raw meal to clinker factor, cross-checked with the pan conveyor scale.Kiln feed meter, pan conveyor scale, lab LOI
      Specific heat consumptionHeat fired in kiln and calciner, in kcal, divided by kg of clinker made; counts coal, pet coke and alternative fuels at their measured calorific value.Fuel feeders, lab GCV, clinker tonnage
      Free limeUncombined CaO in clinker, as a percentage, from hourly samples; the main sign of under- or over-burning.QC lab or auto-sampler
      Specific power consumptionkWh per tonne of product, by section (crushing, raw mill, kiln, cement mill, packing) and for the plant per tonne of cement.Section energy meters, production
      Thermal substitution rate (TSR)Share of kiln heat coming from alternative fuels such as RDF, by calorific value.AFR feeders, lab GCV
      Blaine and residueCement fineness in m²/kg and residue on a sieve, per mill hour, against the recipe target.QC lab
      Clinker factorTonnes of clinker per tonne of cement; falls as fly ash or slag share rises within the standard.Mill feeders, recipe
      Bag weight giveawayAverage bag weight minus the target, in grams, by packer and spout, priced at the cement value.Check-weigher, packer controller
      Truck turnaround time (TAT)Gate-out time minus the truck's reporting time at the parking, split into wait, gate, loading and paperwork.Parking token, gate, weighbridge, invoice

      04Problems it removes

      Four cement plant problems the twin takes off the table.

      Most plants have the data in a DCS, a lab system and SAP. What they lack is one view that says what is costing money now and who should act.

      Problem 01

      Free lime is high and nobody knows why until the next shift.

      The twin joins pile reclaim position, raw meal chemistry and kiln conditions on one timeline, so a raw mix swing from a high-CaO layer is seen and corrected at the raw mill, not argued about in the morning meeting.

      Problem 02

      Specific heat is 10 kcal/kg over norm and it is nobody's number.

      Every kcal over norm is priced in rupees per day and traced to a cause such as false air, cooler air or fuel fineness, then sent to the person who owns it.

      Problem 03

      Mills are run on habit, not on the strength actually needed.

      Blaine, fly ash share and 28-day strength sit on the same mill hour, so over-grinding and spare strength show up as kWh and clinker that can be saved within the standard.

      Problem 04

      Trucks wait hours at the packing plant while bays sit idle.

      Parking, packers, bays and weighbridges share one screen. A jammed spout or an idle bay is flagged at once, and drivers get their bay number on WhatsApp.

      LeanLean on the twin

      Lean tools on the packing floor, the kiln line and the mills, each placed where the work happens.

      A cement plant runs on a few big machines and a lot of small stops. The twin puts each Toyota Production System tool where it applies, keeps its number live from the historian, QC lab, SAP and weighbridge, and sends the exception to its owner on WhatsApp.

      Over the packers · CCR alarms

      Andon

      One lamp per packer and the rail platform: green running, amber watch, red stopped. A jammed spout lights its lamp and goes to the packing fitter; a red lamp still open after 10 minutes goes to the packing in-charge.

      Open calls · andon response time · bags lost per call

      Packing plant · crusher feed

      Takt and production board

      Bags an hour against the plan the trucks in the parking need, and dumper arrivals against the rate the crusher needs. The gap is shown with the stop behind it, filled from packer counters and dumper trips.

      Bags/h vs plan · dumper arrivals vs takt · crusher idle minutes

      Bag store · refractory · additive shed

      Kanban

      Bins for bags, spout spares and burning-zone bricks are coloured by stock against the reorder line. When a bin hits the line, the card goes to stores or purchase on WhatsApp, not when someone notices the shelf is empty.

      Bins at reorder · stock-outs · days of cover

      Packing spares store · raw mill house

      5S

      Yellow-lined zones with a weekly audit score and open red tags. Spillage under a chute or a missing tool on the shadow board shows up on the twin with its owner and age.

      5S audit score · red tags open · tags older than 14 days

      CM-3 roller swap · packer spout change

      SMED

      Each changeover is timed step by step and split into internal work (mill stopped) and external work (done while it runs). Rollers fetched from the store after the stop show up as internal time that can move outside.

      Changeover hours against target · tonnes of cement lost per stop

      Kiln line · mills · dumper fleet

      TPM

      Breakdowns, MTBF, planned maintenance done and open TPM tags per section, joined to the hours of clinker or cement they cost. Shell fans, cooler VFDs and dumper pre-start checks sit on the same board.

      MTBF · breakdown hours · PM compliance · open tags

      Bag check-weigher · clinker silo flap

      Poka-yoke and jidoka

      Every bag is weighed and an under-weight bag is kicked out before it reaches a truck. Clinker with free lime over the limit is routed to the second silo compartment by an interlock, so the error is stopped by the rule.

      Bags rejected · bag giveaway in kg · off-spec clinker in good stock

      Control room · quarry to truck

      Value stream map

      Lead time from limestone face to the dealer's truck, with the stock and waiting at each step: piles, CF silo, clinker silo, cement silos and the truck parking. It shows where time is spent waiting and where value is added.

      Lead time in days · value-add share · truck turnaround time

      MaintenancePredictive maintenance and spares

      Sensors on 64 drives, a health score on each, and the spare checked before the stop.

      A cement plant loses most of its clinker to a handful of big machines. The twin reads vibration, temperature, oil and current from the kiln drive, fans, mill gearboxes, crusher and packers, predicts what will fail and when, checks the spare in SAP stores and books the job into the next planned stop.

      Vibration · oil debris

      Raw mill gearbox

      Bearing outer-race defects weeks ahead, from the rising vibration level, the defect frequency and wear metal in the oil. The repair is booked into a planned stop instead of a 4-day failure.

      Spare: Output bearing, held as a critical spare with its bin and quantity checked in SAP

      Remaining life · mm/s trend · unplanned stop hours

      Bearing temperature · mesh vibration

      Kiln main drive and girth gear

      Pinion bearing and lubrication problems from temperature creep and mesh vibration, before the girth gear is damaged.

      Spare: Pinion bearing set; spray nozzles on a kanban card

      °C per week · mesh vibration vs baseline

      Vibration · winding temperature · VFD faults

      ID fan and cooler fans

      Impeller build-up, bearing wear and drive faults. A fan running derated after a trip is flagged with the cost per hour in clinker.

      Spare: VFD power cards and coupling inserts, with lead time shown when stock is zero

      Fan health · trips per month · derated hours

      Vibration · motor current · mill dP

      Cement mills and crusher

      Gearbox and liner wear, crusher rotor imbalance and hammer wear from the trend in current and vibration per tonne.

      Spare: Liners, hammers and gear sets, including stock in the group pool

      kWh/t drift · MTBF · liner life used

      Spout drive current · bag burst rate

      Packers

      Spout saddle and applicator wear from the bag burst rate at each spout, so the saddle is changed before the packer slows.

      Spare: Spout saddles and suction cups on a two-bin kanban

      Bursts per spout · bags/h lost

      SAP MM · work orders

      Stores and workshop

      Which critical spares are at zero or under minimum against the jobs the sensors are predicting, and the workshop backlog in days.

      Spare: 212 critical items tracked against open predictions

      Critical spares at zero · PM compliance · backlog days

      AgentsAgents on this plant

      One command, every phone and Mac in the plant. Agents act on what the twin shows.

      The twin shows what needs attention; Android X and Autowhat for Mac do the work. Say one thing from your phone and it splits it across the control-room Mac, the dispatch desk and the phones of the people on shift, each running the right agent from the Autowhat 100 in the apps already on it.

      Pick an example
      1. 1You say it onceOn Android X, by voice or text
      2. 2Android X splits itOne job per phone or Mac
      3. 3Each device worksIts agent, in apps already there
      4. 4You OK anything finalOne tap on your phone
      5. 5One summary backWhat was done, what is next
      You · Android X2:20:00 pmDone

      Kiln 1 heat is up 18 kcal/kg since morning. Find out why, fix what we can now and tell me what it is costing.

      Split into 6 jobs across 4 Android phones and 2 Macs

      Jobs done6 of 6
      1. 1Control-room MacTook the job · IoT sensor monitor
      2. 4Quality lab phoneTook the job · Quality checklist runner
      3. 3Shift engineer · RahulTook the job · Maintenance scheduler
      4. 2Dispatch Mac · AnitaTook the job · Data-entry operator
      5. 5Packing supervisorTook the job · Inventory counter
      6. 6Driver · ImranTook the job · Driver coordinator
      7. 1Control-room MacComparing feed, O2 and coal rate with the last 7 days
      8. 4Quality lab phoneRaw meal LSF 99.1 vs 97 target · 2 samples high
      9. 6Driver · ImranCoal truck 40 km out · in by 16:10
      10. 3Shift engineer · RahulOperator confirms coal mill outlet 4 °C low
      11. 5Packing supervisorSilo 2 at 3.2 days · no packing risk
      12. 1Control-room MacCause: high LSF + wet coal · ₹1.3 lakh a day
      13. 2Dispatch Mac · AnitaLog deviation KD-118 and raise feed change?
      14. 2Dispatch Mac · AnitaYou tapped Allow
      15. 2Dispatch Mac · AnitaKD-118 logged · feed change sent to QC
      16. 3Shift engineer · RahulCoal mill temp raised · heat falling 6 kcal/kg
      Android X

      Kiln 1 heat is up because raw meal LSF ran high and the coal is wet: ₹1.3 lakh a day. Coal mill temperature raised, feed correction logged as KD-118. Coal truck in by 16:10.

      Recheck LSF at 16:00?
      Your fleet 4 Android phones · 2 Macs · all onlineWorkingNeeds your OKDone
      1Control-room MacAutowhat for Mac · My own device

      NowCause: high LSF + wet coal · ₹1.3 lakh a day

      H07IoT sensor monitor Done
      2Dispatch Mac · AnitaAutowhat for Mac · Runs with approval

      NowKD-118 logged · feed change sent to QC

      D01Data-entry operator Done
      3Shift engineer · RahulAndroid X · Runs freely

      NowCoal mill temp raised · heat falling 6 kcal/kg

      H04Maintenance scheduler Done
      4Quality lab phoneAndroid X · Runs freely

      NowRaw meal LSF 99.1 vs 97 target · 2 samples high

      H03Quality checklist runner Done
      5Packing supervisorAndroid X · Runs with approval

      NowSilo 2 at 3.2 days · no packing risk

      C04Inventory counter Done
      6Driver · ImranAndroid X · Ask only

      NowCoal truck 40 km out · in by 16:10

      F08Driver coordinator Done

      Every device follows its own rule: my own device runs freely, with approval waits for a tap, ask only just answers. Messages between devices are end-to-end encrypted.

      05A shift on the twin

      One afternoon shift, three calls the twin made.

      Illustrative events in the sample plant, showing who saw what and who acted.

      14:10

      A high-lime layer reaches the reclaimer

      Pile B started giving CaO of 45.3% against a pile average of 44.6%. The twin linked it to the LSF rise at the raw mill and the free lime at the kiln, and sent the feeder correction to the raw mill operator before a third high sample.

      14:14

      A cooler fan fault shows up as hot clinker

      Clinker left the cooler at 168 °C after a fan drive trip. The electrical shift engineer got the fan, the fault time and the rise in clinker temperature in one message, and the quality chemist was warned about gypsum in the hot mill.

      14:28

      An idle bay with 46 trucks waiting

      Bay L-4 had been idle for 42 minutes because its loaders were moved to the rake. The dispatch in-charge returned four loaders and the next three drivers were called by WhatsApp token.

      06How it is built

      How a cement plant digital twin is built from the systems you already run.

      Five steps, starting with your plant layout and the data already in your DCS, lab and ERP, adding sensors only where a number is missing.

      1. 01

        Draw the plant

        We trace the quarry, piles, kiln line, mills, silos, packing plant and gate from drawings or a satellite view, then confirm on site.

      2. 02

        Connect the data

        Historian tags, lab results, SAP orders, weighbridge and energy meters are joined on the section and the production hour.

      3. 03

        Write the norms

        Specific heat, kWh per tonne, free lime, Blaine, bag weight and TAT targets are agreed with your process, quality and dispatch heads.

      4. 04

        Route the alerts

        Each variance goes to its owner on WhatsApp with its rupee impact and the next step: CCR, mill operator, chemist, electrician or dispatcher.

      5. 05

        Review on replay

        Each shift is replayed section by section, so the daily meeting starts from where heat, power or time was lost.

      Data it connects to

      • DCS and historian — kiln, preheater, cooler, mill and fan tags
      • QC lab or LIMS — XRF, free lime, Blaine, residue, SO₃ and strength
      • On-line analyser — raw mix chemistry on the belt or at the mill
      • SAP or ERP — orders, recipes, goods receipts, invoices
      • Mine dispatch or trip logs — dumper trips, bench, payload and diesel
      • Energy meters and substation — power by section, maximum demand, WHRS and solar
      • Packer controllers and check-weighers — bags per hour, bursts and bag weight
      • Gate, weighbridge and rake records — truck times, tare, gross and wagon loading

      Rollout

      1. Weeks 1–2 · DrawPlant traced and confirmed; historian, lab and energy data mapped to each section.
      2. Weeks 3–4 · ConnectKiln line and mills live with specific heat, free lime and kWh per tonne against norm.
      3. Weeks 5–6 · AlertNorms agreed and WhatsApp alerts live for quality, heat, power and maximum demand.
      4. Weeks 7–8 · ExtendQuarry trips, packing plant, gate and rake loading added; replay used in the daily meeting.

      07Compared

      Cement plant digital twin vs DCS screens and spreadsheets, compared

      Daily reports & spreadsheetsDCS, historian and expert systemsAutowhat cement plant digital twin
      What it showsYesterday's production and consumptionLive process values for one area at a timeEvery section from quarry to gate, live, against norm
      Quality linkLab results in a separate sheetUsually not joined to process tagsFree lime, Blaine and strength on the same hour as the process
      MoneyMonthly cost reportsNot shownEach variance priced in rupees per day
      ControlNoneClosed-loop control of the kiln or millAdvice and alerts to people; control stays with your DCS and operators
      DispatchSeparate dispatch registerOutside scopePackers, bays, parking, rake and weighbridge in the same model
      Who actsDecided in the morning meetingThe CCR operatorThe owner of each variance, on WhatsApp, during the shift
      Best fitSmall grinding unitsStable kiln and mill controlPlants that want one view of cost, quality and dispatch across sections

      Terms used on this page

      Free lime
      Calcium oxide left uncombined in clinker; high values mean the clinker was under-burnt or the raw mix was too rich in lime.
      LSF (lime saturation factor)
      A ratio of lime to silica, alumina and iron in raw meal that shows how much lime the raw mix can combine.
      Specific heat consumption
      Heat used per kg of clinker, in kcal/kg; modern preheater kilns typically run around 680–750 kcal/kg.
      Preheater and calciner
      The tower of cyclones where hot kiln gas heats the raw meal, and the vessel where most of the limestone is calcined before the kiln.
      Blaine
      A measure of cement fineness as specific surface area, in m²/kg.
      PPC and OPC
      Portland pozzolana cement, made with fly ash under IS 1489, and ordinary Portland cement, made from clinker and gypsum.
      WHRS
      Waste heat recovery system: boilers on preheater and cooler exhaust that drive a steam turbine for captive power.
      TSR
      Thermal substitution rate: the share of kiln heat from alternative fuels such as RDF instead of coal or pet coke.

      Read next

      FAQQuestions about cement plant digital twins

      Straight answers, before the call.

      Answers to what plant, process, quality and dispatch heads ask us most.

      What is a digital twin in the cement industry?

      A digital twin in the cement industry is a live model of a plant that updates from the DCS, historian, QC lab, ERP and weighbridge. It shows each section from the quarry to dispatch against its norm, prices variances in rupees and sends them to the person who can act during the shift.

      How is a cement plant digital twin different from a DCS or an expert control system?

      A DCS and an expert system control the kiln and mills from process tags. The twin does not take over control. It joins those tags with lab results, energy, orders and dispatch across the whole plant, so a quality, heat or dispatch problem is seen with its cause, cost and owner.

      Can a digital twin reduce kiln specific heat consumption?

      It helps by showing specific heat against norm every hour and tracing the gap to a cause such as false air in the preheater, low cooler air, coarse fuel or a raw mix swing. Each cause is priced in rupees per day and sent to its owner, so corrections are made in the same shift.

      How does the twin help with high free lime in clinker?

      Free lime results are placed on the same timeline as raw meal chemistry, the reclaimer position on the pre-blending pile and kiln conditions. When free lime rises, the twin shows whether the raw mix, the fuel or burning conditions changed first, and routes the correction to the raw mill or the CCR.

      How is power consumption per tonne of cement tracked?

      Energy meters by section are divided by the tonnes each section produced: crushing, raw mill, kiln and coal mill, cement mills, packing and utilities. The twin shows each against its norm every shift, and warns when maximum demand approaches the contract limit.

      Does it cover waste heat recovery and solar power?

      Yes. WHRS boiler inlet temperatures, steam flow and turbine output are shown against design, together with solar output and grid import. A shortfall, such as a cooler bypass damper left open, is priced in rupees per day of grid power.

      Can it optimise cement mill fineness and fly ash share?

      The twin puts Blaine, residue, SO₃, fly ash share and 28-day strength on the same mill hour. That shows where cement is ground finer than the strength needs or where fly ash can rise within IS 1489 limits. Recipe changes stay with your quality head.

      How does it reduce truck turnaround time at a cement plant?

      It times every truck from reporting at the parking to gate-out, and shows packers, loading bays, weighbridges and the rake on one screen. Jammed spouts, idle bays and paperwork delays are flagged as they happen, and drivers get their bay number on WhatsApp.

      What data does a cement plant digital twin need?

      Most plants start with what they already have: historian tags from the DCS, QC lab results, SAP orders and invoices, energy meters and weighbridge records. Mine dispatch logs, packer controllers and gate RFID make it more complete, and can be added section by section.

      Do we need new sensors to start?

      Usually not. A cement plant already records most process values in the DCS and quality in the lab. Sensors are added only where a number is missing, such as a belt scale on a reclaim conveyor or a bag counter at a truck bay.

      Can it be used at a split grinding unit or a packing terminal?

      Yes. A grinding unit twin covers clinker receipt, mills, silos, packers and dispatch, without the quarry and kiln. A packing terminal twin covers bulk receipt, packers, bays, rakes and the truck gate. The same norms and alerts apply.

      Who uses a cement plant digital twin?

      The plant head uses it for the whole-plant view, process and quality heads for the kiln and mills, the energy manager for heat and power, the mines manager for the quarry and the dispatch head for packers and trucks. Operators and dealers receive alerts and updates on WhatsApp.

      How does a digital twin support lean manufacturing in a cement plant?

      The twin keeps lean tools live with plant data: andon lamps over the packers, a takt board for packing and crusher feed, kanban bins for bags, spares and refractory, 5S zones with audit scores, SMED timing on roller and spout changes, TPM boards for the kiln line and mills, a check-weigher poka-yoke on every bag and a value stream map from quarry to truck. Each exception goes to its owner on WhatsApp.

      Can the twin track SMED and TPM on kilns and cement mills?

      Yes. A changeover such as a VRM roller swap is timed step by step and split into internal and external work, so the twin shows how many hours could move outside the stop and how many tonnes that is worth. TPM boards show breakdowns, MTBF, planned maintenance done and open tags for the kiln line, mills and dumpers.

      How do andon and kanban work in a cement packing plant?

      Each packer has an andon lamp that turns amber or red from its bag counter and stop log; a red call goes to the fitter on WhatsApp and escalates if it stays open. Bag stock and spout spares sit in kanban bins with a reorder line, and the card goes to stores or the bag supplier when a bin reaches it.

      How much does a cement plant digital twin cost in India?

      It is priced per deployment after a 30-minute working session on your own data; there is no public list price. Cost depends on the sections covered, the systems to connect and whether any sensors or cameras are needed.

      Where does the data live, and who owns it?

      The data stays yours, wherever the twin runs. It runs on managed cloud, in your own VPC on AWS, Azure or GCP, or on-premises with your keys, and India data residency is available when required. Process, lab and dispatch records remain your company's data.

      08Briefing

      Send us a week of kiln and dispatch data. We'll show you your plant as a twin.

      A working session: your plant drawn, a week of heat, power, quality and truck data set against norm, and the first alerts written with your team.