Furnaces · tapping floor · crusherAndon
One lamp per furnace, the batching house, the casting beds and the crusher. A red lamp goes to its owner on WhatsApp, and a call still open after 10 minutes goes to the shift in-charge.
Open calls · response time · taps delayed
Electrodes · furnace transformersTPM
Electrode length, slips, paste level and clamp water sit with transformer oil temperature and tap position, and with breakdowns and open TPM tags. A skipped paste-level check shows up before it becomes an electrode break.
Electrode breaks · MTBF · checks signed · open tags
Ladle and tap-hole changeoverSMED
Each ladle change is timed and split into internal and external work. Pre-heating the spare ladle and staging the tap-hole kit before the stop are the usual first moves.
Minutes per change vs target · taps delayed
Tapping floorStandard work
The tapping sequence with a standard time per step: checks, opening the tap hole, tapping and sampling, plugging. A step running long, such as a tap hole taking 9 minutes to open, is flagged against the standard.
Minutes per step vs standard · tap-to-tap time
Paste store · electrode casingsKanban
Paste, casings and clamp spares are coloured by stock against the reorder line, with consumption from the furnace that uses them. The card goes to stores on WhatsApp when a bin hits the line.
Days of paste · casings on the rack · stock-outs
Weigh batchingPoka-yoke
A batch outside the recipe's weight band cannot be discharged, and a bin refill is blocked if the lot is not the recipe lot. Moisture corrections are applied to the weights automatically.
Batches blocked · weighing accuracy · wrong-lot scans
Tapping floor · crushing5S
Yellow-lined zones with a weekly audit score and open red tags, such as spent lances on the tapping floor or spillage under the screen. Each tag shows its owner and age.
5S audit score · red tags open
Furnaces · labOEE and first-pass yield
OEE per furnace splits losses into availability, rate and quality on every tap. First-pass yield counts taps on grade at the first assay, and an off-grade tap is blocked from the wrong order.
OEE by furnace · taps on grade first time · tonnes blended