01Draw the floor
Doors, racks, aisles, levels, mezzanine, packing and staging are traced from the layout drawing and checked on a site walk, so every bin code has a place in 3D.
02Fix the product master
Each SKU and packing gets a checked weight, size and zone, because putaway, bag and pick suggestions all read from it.
03Connect the records
WMS or ERP stock, the purchase list, gate entries, dock bookings, scanner events and route plans are joined on one record.
04Set the rules and owners
Dwell norms, occupancy limits, pick rates and cut-offs are agreed with the warehouse team, and each alert gets a named owner.
05Run, replay and tune
Shifts are reviewed on the replay, missed alerts become new rules, and more areas or sites are added on the same record.